What to pay attention to before installing aluminum honeycomb core

Source:admin Release time:2023-05-26 09:56:57 Hits: 1

What should be paid attention to before installing aluminum honeycomb core?

1. Aluminum honeycomb core inspection

The type, quantity, quality, color, pattern, line and order number of the aluminum honeycomb core are correct. The aluminum honeycomb core installation sequence is numbered. If the same module has different colors, it needs to be stacked in batches to facilitate the installation of workers.

2. Keel detection

The specifications and shape of curtain wall keels, such as steel keels, should meet the design requirements. Before the installation of the keel, rust removal, rust prevention, and anti-corrosion treatment should be carried out.

3. Special requirements

If the aluminum honeycomb core exterior wall has sealing and waterproofing requirements, it should be noted that there is adhesive on the surface of the initial design, and the remaining adhesive should be coated. Indoor compact panels generally do not involve adhesive waterproofing.

4. Transportation of building materials

The aluminum honeycomb core and accessories will be transported to various construction sites through vertical transportation equipment such as elevators. Handle with care during transportation. The impact of force can damage the edges and layout of the aluminum honeycomb core, thereby affecting construction.


Navigation